| Standup L-Set TE Research Optimization II
| None | 0 | 0.0% | 23,970,000,000.00 | 23,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,294,000,000.00 | 2,294,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing II
| None | 0 | 0.0% | 362,000,000.00 | 362,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization I
| None | 0 | 0.0% | 196,000,000.00 | 196,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency I
| None | 0 | 0.0% | 515,000,000.00 | 515,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,699,000,000.00 | 5,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 770,000,000.00 | 770,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency I
| None | 0 | 0.0% | 4,539,000,000.00 | 4,539,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization I
| None | 0 | 0.0% | 1,475,000,000.00 | 1,475,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System I
| None | 0 | 0.0% | 231,000,000.00 | 231,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator II
| None | 0 | 0.0% | 1,684,000,000.00 | 1,684,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Time Efficiency II
| None | 0 | 0.0% | 2,192,000,000.00 | 2,192,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,347,000,000.00 | 2,347,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reactor Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Blueprint Copy Optimization II
| None | 0 | 0.0% | 23,970,000,000.00 | 23,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,347,000,000.00 | 2,347,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Enhanced Targeting System II
| None | 0 | 0.0% | 372,700,000.00 | 372,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Accelerator I
| None | 0 | 0.0% | 198,000,000.00 | 198,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,345,000,000.00 | 2,345,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency I
| None | 0 | 0.0% | 501,900,000.00 | 501,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,697,000,000.00 | 5,697,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,299,000,000.00 | 2,299,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor I
| None | 0 | 0.0% | 7,700,000,000.00 | 7,700,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Basic Capital Component Manufacturing Efficiency
| None | 0 | 0.0% | 6,997,000,000.00 | 6,997,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,348,000,000.00 | 2,348,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor I
| None | 0 | 0.0% | 3,325,000,000.00 | 3,325,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 770,000,000.00 | 770,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency I
| None | 0 | 0.0% | 769,000,000.00 | 769,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Composite Reactor Material Efficiency II
| None | 0 | 0.0% | 2,192,000,000.00 | 2,192,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Reprocessing Monitor II
| None | 0 | 0.0% | 38,970,000,000.00 | 38,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Thukker Advanced Component Manufacturing Efficiency
| None | 0 | 0.0% | 6,600,000,000.00 | 6,600,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Missile Flight Processor II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency I
| None | 0 | 0.0% | 515,000,000.00 | 515,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency I
| None | 0 | 0.0% | 5,697,000,000.00 | 5,697,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 774,000,000.00 | 774,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor I
| None | 0 | 0.0% | 8,997,000,000.00 | 8,997,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency I
| None | 0 | 0.0% | 58,970,000,000.00 | 58,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control I
| None | 0 | 0.0% | 2,850,000,000.00 | 2,850,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,229,000,000.00 | 2,229,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency I
| None | 0 | 0.0% | 769,000,000.00 | 769,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Time Efficiency II
| None | 0 | 0.0% | 2,199,000,000.00 | 2,199,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Drone and Fighter Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,300,000,000.00 | 2,300,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Reprocessing Monitor II
| None | 0 | 0.0% | 39,970,000,000.00 | 39,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,347,000,000.00 | 2,347,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Energy Neutralizer Feedback Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 735,000,000.00 | 735,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,348,000,000.00 | 2,348,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency I
| None | 0 | 0.0% | 515,000,000.00 | 515,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,638,000,000.00 | 5,638,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 774,000,000.00 | 774,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision I
| None | 0 | 0.0% | 265,000,000.00 | 265,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 58,970,000,000.00 | 58,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization II
| None | 0 | 0.0% | 1,684,000,000.00 | 1,684,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System I
| None | 0 | 0.0% | 3,340,000,000.00 | 3,340,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Thukker Advanced Component Manufacturing Material Efficiency
| None | 0 | 0.0% | 610,000,000.00 | 610,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,340,000,000.00 | 2,340,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Hybrid Reactor Material Efficiency II
| None | 0 | 0.0% | 2,199,000,000.00 | 2,199,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Small Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,347,000,000.00 | 2,347,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Precision II
| None | 0 | 0.0% | 356,900,000.00 | 356,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 425,700,000,000.00 | 425,700,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Cost Optimization I
| None | 0 | 0.0% | 198,000,000.00 | 198,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set EW Command System II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency I
| None | 0 | 0.0% | 5,699,000,000.00 | 5,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency I
| None | 0 | 0.0% | 517,000,000.00 | 517,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,699,000,000.00 | 5,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection I
| None | 0 | 0.0% | 271,000,000.00 | 271,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator I
| None | 0 | 0.0% | 198,000,000.00 | 198,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer I
| None | 0 | 0.0% | 3,200,000,000.00 | 3,200,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Ammunition Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 765,000,000.00 | 765,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Time Efficiency II
| None | 0 | 0.0% | 2,192,000,000.00 | 2,192,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Medium Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Projection II
| None | 0 | 0.0% | 360,000,000.00 | 360,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Laboratory Optimization I
| None | 0 | 0.0% | 25,970,000,000.00 | 25,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Invention Accelerator II
| None | 0 | 0.0% | 1,458,000,000.00 | 1,458,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Bomb Aimer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,697,000,000.00 | 5,697,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,444,000,000.00 | 2,444,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency I
| None | 0 | 0.0% | 515,000,000.00 | 515,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency I
| None | 0 | 0.0% | 5,699,000,000.00 | 5,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 769,000,000.00 | 769,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection I
| None | 0 | 0.0% | 205,000,000.00 | 205,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency I
| None | 0 | 0.0% | 58,970,000,000.00 | 58,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator II
| None | 0 | 0.0% | 1,425,000,000.00 | 1,425,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control I
| None | 0 | 0.0% | 2,977,000,000.00 | 2,977,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Biochemical Reactor Material Efficiency II
| None | 0 | 0.0% | 2,192,000,000.00 | 2,192,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Basic Capital Component Manufacturing Efficiency II
| None | 0 | 0.0% | 25,410,000,000.00 | 25,410,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,345,000,000.00 | 2,345,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Missile Projection II
| None | 0 | 0.0% | 364,800,000.00 | 364,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Structure and Component Manufacturing Efficiency II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Accelerator I
| None | 0 | 0.0% | 199,900,000.00 | 199,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Point Defense Battery Control II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,699,000,000.00 | 5,699,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,299,000,000.00 | 2,299,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor I
| None | 0 | 0.0% | 633,700,000.00 | 633,708,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency I
| None | 0 | 0.0% | 5,689,000,000.00 | 5,689,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,195,000,000.00 | 2,195,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy I
| None | 0 | 0.0% | 279,800,000.00 | 279,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiency
| None | 0 | 0.0% | 58,970,000,000.00 | 58,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization II
| None | 0 | 0.0% | 1,684,000,000.00 | 1,684,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array I
| None | 0 | 0.0% | 3,325,000,000.00 | 3,325,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Large Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency I
| None | 0 | 0.0% | 669,900,000.00 | 669,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Asteroid Ore Grading Processor II
| None | 0 | 0.0% | 1,823,000,000.00 | 1,823,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Structure Manufacturing Efficiency II
| None | 0 | 0.0% | 27,980,000,000.00 | 27,980,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Large Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 769,000,000.00 | 769,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Energy Neutralizer Economy II
| None | 0 | 0.0% | 384,000,000.00 | 384,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set ME Research Cost Optimization I
| None | 0 | 0.0% | 198,000,000.00 | 198,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Target Acquisition Array II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency I
| None | 0 | 0.0% | 6,200,000,000.00 | 6,200,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ammunition Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor I
| None | 0 | 0.0% | 644,900,000.00 | 644,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization I
| None | 0 | 0.0% | 1,499,000,000.00 | 1,499,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency II
| None | 0 | 0.0% | 2,345,000,000.00 | 2,345,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection I
| None | 0 | 0.0% | 220,000,000.00 | 220,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization II
| None | 0 | 0.0% | 1,684,000,000.00 | 1,684,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer I
| None | 0 | 0.0% | 39,970,000,000.00 | 39,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Equipment Manufacturing Efficiency II
| None | 0 | 0.0% | 27,890,000,000.00 | 27,890,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency I
| None | 0 | 0.0% | 769,000,000.00 | 769,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Ice Grading Processor II
| None | 0 | 0.0% | 1,954,000,000.00 | 1,954,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Invention Optimization II
| None | 0 | 0.0% | 23,970,000,000.00 | 23,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Projection II
| None | 0 | 0.0% | 360,000,000.00 | 360,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Cost Optimization I
| None | 0 | 0.0% | 196,000,000.00 | 196,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Missile Fire Control Computer II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency I
| None | 0 | 0.0% | 602,900,000.00 | 602,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency II
| None | 0 | 0.0% | 27,970,000,000.00 | 27,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Equipment Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,347,000,000.00 | 2,347,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor I
| None | 0 | 0.0% | 589,000,000.00 | 589,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization I
| None | 0 | 0.0% | 1,475,000,000.00 | 1,475,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy I
| None | 0 | 0.0% | 224,000,000.00 | 224,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator II
| None | 0 | 0.0% | 1,684,000,000.00 | 1,684,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator I
| None | 0 | 0.0% | 39,970,000,000.00 | 39,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Efficiency II
| None | 0 | 0.0% | 2,168,000,000.00 | 2,168,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Capital Ship Manufacturing Efficiency I
| None | 0 | 0.0% | 5,697,000,000.00 | 5,697,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency I
| None | 0 | 0.0% | 770,000,000.00 | 770,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Ore Grading Processor II
| None | 0 | 0.0% | 1,954,000,000.00 | 1,954,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set ME Research Optimization II
| None | 0 | 0.0% | 23,970,000,000.00 | 23,970,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Advanced Component Manufacturing Time Efficiency I
| None | 0 | 0.0% | 748,000,000.00 | 748,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Electronic Warfare Economy II
| None | 0 | 0.0% | 360,000,000.00 | 360,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set TE Research Accelerator I
| None | 0 | 0.0% | 190,000,000.00 | 190,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set EW and Emissions Co-ordinator II
| None | 0 | 0.0% | 0.00 | 0.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability I
| None | 0 | 0.0% | 607,900,000.00 | 607,908,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency I
| None | 0 | 0.0% | 6,200,000,000.00 | 6,200,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Small Ship Manufacturing Time Efficiency II
| None | 0 | 0.0% | 2,325,000,000.00 | 2,325,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency I
| None | 0 | 0.0% | 4,994,000,000.00 | 4,994,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set TE Research Optimization I
| None | 0 | 0.0% | 1,475,000,000.00 | 1,475,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
| None | 0 | 0.0% | 640,000,000.00 | 640,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Structure Target Multiplexing I
| None | 0 | 0.0% | 269,800,000.00 | 269,808,500.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Blueprint Copy Cost Optimization II
| None | 0 | 0.0% | 2,250,000,000.00 | 2,250,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup XL-Set Extinction Level Weapons Suite I
| None | 0 | 0.0% | 39,970,000,000.00 | 39,970,034,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Moon Drilling Stability II
| None | 0 | 0.0% | 2,146,000,000.00 | 2,146,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Advanced Component Manufacturing Efficiency II
| None | 0 | 0.0% | 25,780,000,000.00 | 25,780,017,000.00 | 0.00 | 0.0% | 0.00 |
| Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
| None | 0 | 0.0% | 660,000,000.00 | 660,008,500.00 | 0.00 | 0.0% | 0.00 |
| Standup L-Set Moon Drilling Proficiency II
| None | 0 | 0.0% | 24,980,000,000.00 | 24,980,017,000.00 | 0.00 | 0.0% | 0.00 |