| Prototype Jump Drive Economizer | 3.7 | 15 | 405.4% | 364,900,000.00 | 368,400,000.00 | 499,500,000.00 | 35.6% | 1,903,930,000.00 |
| Experimental Jump Drive Economizer | 47.6 | 37 | 77.7% | 16,560,000.00 | 20,060,000.00 | 16,000,000.00 | -20.2% | 982,600,266.62 |
| Limited Jump Drive Economizer | 2.6 | 35 | 1,346.2% | 6,090,000.00 | 9,590,000.00 | 27,300,000.00 | 184.7% | 70,403,666.67 |